Floors: The floors are finished and look fantastic. We are extremely happy with our decision to go ahead and have them refinished.
Guest Bedroom: We installed a ceiling fan in the guest bedroom which doesn’t sound like too big of a deal, however that required updating the electrical (all the way from the breaker box to the switch and then up to the box in the ceiling, as well as actually cutting a hole in the ceiling and mounting a box. The previous light had only been screwed into the lath. We also have the first coat of paint on the walls in the guest bedroom.
Bathroom: New electrical boxes are in place for everything. I installed recessed lights the other night, as well as an exhaust fan (there hadn’t been one previously). All that’s left to do for the electrical is put in the 4 outlets and the switch for the light that mounts on the wall above the vanity.
Kitchen: The apple wallpaper is off, decades worth of shelf liner is removed and the kitchen is almost ready for paint.
I think that’s most of what we’ve done this past week. Our top priority is the bathroom, as that’s what is keeping us from moving in. Our furniture and stuff arrives sometime in the early part of this next week, so hopefully we can make a lot of progress this weekend.